System Operational
3

Portfolio Overview

Real-time overview of your solar portfolio performance and key metrics.

Last updated: 20 May 2025 | 11:30 AM
Total Sites
128
8 vs Last FY +6.67%
Total Capacity
1,245.50 MWp
95.40 MWp +8.30%
Generation
1,842.65 MWh
120.45 MWh -6.14%
Revenue
15.68 Crore
1.25 Cr +8.68%
Plant Availability
98.35 %
1.85% +1.92%
Grid Availability
99.12 %
0.92% +0.93%
CUF
18.74 %
0.85% -4.34%
LD Exposure
2.35 %
0.45% -16.10%

Generation Trend (MWh)

Generation vs Target (MWh)

Availability Trend (%)

Portfolio Health

86% Overall Health
Operational Sites 102 (79.69%)
Attention Required 18 (14.06%)
Critical Sites 8 (6.25%)
Average Availability 98.35%

CUF Trend (%)

Revenue Trend (₹ Crore)

Portfolio Geographic View

View Full Map
Rajasthan: 450 MWp Installed Gujarat: 295 MWp Installed Madhya Pradesh: 180 MWp Installed Maharashtra: 145 MWp Installed Karnataka: 90 MWp Installed Tamil Nadu: 120 MWp Installed
Capacity (MWp)
> 200
100-200
50-100

Site Status Overview

Real-time Operational Classification
Operational
102
79.69% of Total Portfolio
Underperforming
18
14.06% of Total Portfolio
Shutdown
5
3.91% of Total Portfolio
Curtailment
3
2.34% of Total Portfolio

Top Performing Sites (by CUF)

# Site CUF (%) Generation (MWh)
1Punjab Solar Park 124.6528,645
2Gujarat Plant 422.8926,541
3Rajasthan Plant 322.3124,982
4Maharashtra Plant 221.7423,654
5Karnataka Plant 121.3521,845

Underperforming Sites

Site Expected Actual Variance Availability Status
Rajasthan Plant 72,1501,120-47.91%91.20%High
Madhya Pradesh 31,8501,050-43.24%88.65%High
Gujarat Plant 22,3001,350-41.30%90.10%High
Tamil Nadu Plant 51,9501,190-38.97%92.30%Medium
Andhra Plant 12,1001,310-37.62%93.45%Medium

Critical Alerts

Alert Type Site Description Severity Time Action
Inverter Fault Solar Park Bikaner Inverter 03 not responding Critical 20 May 2025 10:45 AM
Low Generation Rajasthan Plant 7 Gen below 70% of expected High 20 May 2025 09:30 AM
Comm Loss Gujarat Plant 2 Data not received 30 mins High 20 May 2025 09:15 AM
High Temp Madhya Pradesh 3 Transformer temp high Medium 20 May 2025 08:50 AM
Grid Curtailment Tamil Nadu Plant 5 Grid curtailment in progress Low 20 May 2025 08:20 AM

Top Performance Master Directory

Site State Capacity (MWp) CUF (%) Status Action
Punjab Solar Park 1 Punjab 50.00 24.65 Operational Details
Gujarat Plant 4 Gujarat 40.00 22.89 Operational Details
Rajasthan Plant 3 Rajasthan 35.00 22.31 Operational Details
Maharashtra Plant 2 Maharashtra 30.00 21.74 Operational Details
Rajasthan Plant 7 Rajasthan 25.00 11.20 Underperforming Details